S. NO. | PROJECT NAME | CLIENT | CONSULTANT | MAIN CONTRACTOR | SCOPE OF WORK |
1 | Emirati Housing Development Jebel Hafeet- Al Ain | ACE Consultant | Dorsch Gruppe DC Abu Dhabi | Pal Technology | Precast Concrete Elements |
2 | Al Ghadeer Development Phase 1 Residential , Retail and Community Facilities G+4 | Sorouh | ECG Engineering Consultants Group | Square General Contracting Co | Precast Concrete Elements |
3 | Al Ghadeer Development Phase 1 Residential , Retail and Community Facilities G+4 (Terraced Apartment) | Sorouh | ECG Engineering Consultants Group | Construction General Contracting | Precast Concrete Elements |
4 | Al Sila’a Villa, On Plot P1001, Bahia Al Sila’a, Western Region, UAE | Sorouh | JLA International Engineering | Pivot Engineering & General Contracting Company(W.L.L.) | Precast Concrete Elements |
5 | 200 Units Staff Accommodation at Baraka Site, Abu Dhabi | Emirates Nuclear Energy Corporation (ENEC) | Center Point Architectural Engineering | International, Mechanical & Electrical Co.W.L.L. (IMECO) | Precast Concrete Elements |
6 | Additional Construction of 200 Units Staff Accommodation at Baraka Site, Abu Dhabi | Emirates Nuclear Energy Corporation (ENEC) | Center Point Architectural Engineering | International, Mechanical & Electrical Co.W.L.L. (IMECO) | Precast Concrete Elements |
7 | Abu Dhabi International Midfield Terminal Complex | Abu Dhabi Airports Company | Khon Pedersen Fox Associates (International) PA Architects & Planning Consultants | Arabtec/CCC/ Tav | Precast Concrete Elements |
8 | Al Falah Community Development Project | Al Dar Properties | Fluor Mideast/Atkins | Al Jaber Group | Precast Boundary Wall |
9 | Al Shahama Residence, Al Shahama C252-B, G+3+R Residential/ Commerical Building | Ali Mohamed Sadeq Al Balooshi | Pioneer | Ghantoot Group | Precast Concrete Elements |
10 | Ruwais Housing Compex Expansion Phase III – New Sewage Treatment Plant | ADNOC | ACE International Consulting Engineers | METITO LLC | Precast Concrete Elements |
11 | Ruwais Housing Complex Expansion IV Accommodation Bldgs. (G+5) | ADNOC | Altorath Consulting Engineers | Al Jaber | Precast Buildings |
12 | Al Dhafra Workers Village | H.H. Sheikh Mohammed Bin Khalifa Bin Zayed Al Nahyan | Biladi Engineering Consultant | Orient House For Development | Precast Concrete Elements |
13 | Ruwais Housing Complex Expansion Phase (III), Design & Construction of Ruwais Shopping Mall- Package 10 Project No 6013 Agreement No. 116013C1 | ADNOC | ECG Engineering Consultants Group | Gulf Contracting & GDM Construction | Precast Concrete Elements |
14 | Meydan Heights | Meydan Group LLC / Emirates Group JV | AK Design | Guangsha Middle East Construction LLC | Precast Concrete Elements |
15 | Ritz-Carlton Abu Dhabi, Grand Canal | Abu Dhabi National Hotels | OTAK International | Al Habtoor Engineering | Precast Boundary Wall |
16 | Labor Accommodation at Al Mafraq | Ghantoot Transport & Contracting Co. | Arab Engineers Consultants | Tefco International Cont. L.L.C | Precast Concrete Elements |
17 | Renovation of Al Buteen Palace | Crown Prince Court | Hans Knutzen Associates, Inc (H.K.A) | Capriole Construction Co. L.L.C | Precast Boundary Wall |
18 | Abu Dhabi Future School Program Al Shamkha, Al Shawamekh, Baniyas | Abu Dhabi Education Council (ADEC) MUSANADA | Dewan Architects & Engineers | Amana Contracting & Steel Building Company W.L.L. | Precast Concrete Elements |
19 | The Development of South Shamkha Infrastructure | Musanada | Mot Mac Donald | Arc Abu Dhabi Contracting L.L.C | Precast Substations |
20 | Various Constructions for Border Guard Group H.Q ( 4 Sites) | General Head Quarter’s Command of MilitaryWorks | General Head Quarter’s Command of Military Works | Orient House For Development & Construction L.L.C. | Precast Concrete Elements |
21 | Construction of Boundary Wall, Car Park and Tower Surveillance for Falah Military/1 | Commander Military Works Abu Dhabi | Commander Military Works Abu Dhabi | El Race Construction & General Contracting | Precast Concrete Elements |
22 | CMW-11003-C001 | Commander Military Works Abu Dhabi | Commander Military Works Abu Dhabi | Code Contracting Company (L.L.C) | Hollow Core Slabs |
23 | Camp No: 121516 on Al Ain Military (Drain Water Chanal Culvert) | Commander Military Works Abu Dhabi | N/A | Emirates Shooting Equipments | Precast Concrete Culvert |
24 | Precast Boundary Wall around Police Buildings and Plots in Alain | Abu Dhabi Police GHQ | Abu Dhabi Police GHQ. Engineering Projects Adm. | Al Rawafid Engineering & Cont. Co. | Precast Boundary Wall |
25 | H.H. Sheikh Seif Palace | Private office of H.H. Sheikh Seif Bin Zayed AL Nahyan | Private office of H.H. Sheikh Seif Bin Zayed AL Nahyan | Venus Contracting | Hollow Core Slabs |
26 | Abu Dhabi Islamic Bank Headquarters | Abu Dhabi Islamic Bank | Woods Bagot | Al Habtoor Leighton LLC | Precast Stairs |
27 | Siemens Head Quarters Masdar City, Abu Dhabi | Siemens | AECOM Middle East Ltd. | Al Faraa General Contracting | Precast Concrete Elements |
28 | Bloom Gardens | Bloom Properties | World Planners | Emirates Link Maltauro | Precast Concrete Elements |
29 | Brighton College | Bloom Properties | AEC | Emirates Link Maltauro | Precast Concrete Elements |
30 | Bloom Academy | Bloom Properties | Broadway Malyan | Al Rostomani Pegel L.L.C | Precast Concrete Elements |
31 | Bawabat Al Sharq School | Baniyas Investment & Development Company L.L.C | NEB Engineering Consultancy Office | Perfect Construction Gen. Cont. LLC | Precast Concrete Elements |
32 | Bawabat Al Sharq Phase 2 Buildings | Baniyas Investment & Development Company L.L.C | AECOM / | Emirates Link Maltauro L.L.C | Precast Concrete Elements & Pre-stressed Hollow Core Slabs |
33 | Abu Dhabi International Airport Expansion. Design & Build Catering South Side Improvement | Abu Dhabi Airports Company (ADAC) | BWGulf Engineers, Planners & Managers | Emirates Link Maltauro L.L.C | Precast Concrete Elements |
34 | PI High School Accommodation Buildings at Sas Al Nakhl Project No.6000 Agreement No. 116000 C1 | ADNOC | Al Torath Engineering Consultants Consulting Engineers & Project Managers | Amana Contracting & Steel Buildings Co. W.L.L | Hollow Core Slabs |
35 | PI Staff Accomodation at Maqta Area Construction Works- Package 2 | ADNOC | ECG Engineering Consultants Group | SK Engineering & Construction | Precast Concrete Elements |
36 | Innovation Center for Borouge in Abu Dhabi | ADNOC | ECG Engineering Consultants Group | ASCON | Precast Concrete Elements |
37 | Raha International School at Al Raha Gardens | Al Dar Properties | Architectural Designing & Decoration | Six Sigma Middle East Constructions | Precast Concrete Elements |
38 | H.M Villa (4 Nos) at Abu Dhabi Khalifa A | Mr. Hamad Al Mansoor | Western Engineering Consultant | Mr. Hamad Al Mansoor | Precast Concrete Elements |
39 | Recreation centre, mini market, shops & offices Al-Naser industries worker’s city | Al Naser Industries | ARENCO | Al Ameda Al Thahabia Transport | Precast Concrete Elements |
40 | B2B Office Building | Al Fahim | Khatib & Alami | Ali & Sons Contracting Company | Precast Planks |
41 | Industrial Complex in Mussafah | Emirates Link Contracting Establishment | Architectural Consluting Group ACG | Emirates Link Contracting Establishment | Precast Concrete Elements |
42 | Abu Dhabi- Zayed Military City Al Shahama | Directorate of Military Works | Directorate of Military Works | Dripico Group Contracting | Hollow Core Slabs |
43 | Al Hamra Project | Commander Military Works Abu Dhabi | Commander Military Works Abu Dhabi | Capriole Construction Company | Hollow Core Slabs |
44 | AL Dhafra Air Base | UAE Armed Forces | UAE Armed Forces | Best Power Electrical Cont | Precast Footings |
45 | Private Farm (2) Al Hamma Rest House at Al Ain | Private office | Private office | Private office | Precast Concrete Elements |
46 | Abu Dhabi Centre for Technical and Vocational Education & Training | ELID | Shaheen Engineering Consultancy | Al Zamalek General Contracting Co. | Precast Concrete Elements |
47 | Yas Marina Enhancement Project, Yas Island, Abu Dhabi | Minal | Center Point Architectural Engineering | IMECO | Precast Concrete Elements |
48 | Arkan Cement Factory | Arkan Building Materials | JACOBS | Hadeed Emirates Contracting | Precast Boundary Wall |
49 | Arkan Block Factory | Arkan Building Materials | Syrex | Petron Emirates Contracting & Mfg | Hollow Core Boundary Wall |
50 | Fertile 2 Ammonia/ Urea Expansion Project | Fertil, Ruwais Fertilizer Industries | UHDE | Samsung Engineering Co. LTD. | Precast Trensh Cover & Precast Lighting Pole Foundations |
51 | New Administration Building for Fertil at Ruwais | ADNOC | N/A | Code Contracting Company (L.L.C) | Hollow Core Slabs |
52 | Apartment Hotel | Mr. Mohamed Al Mansori | Hannover Consulting Engineering | Almansouri 3B | Hollow Core Slabs |
53 | Al Bakhet Resort | Mr. Hessa & Bakheta M. Khaled Al Mansoori | JIDAR Engineering Consultant | Saqar Al Badeiya General Contracting | Precast Concrete Elements |
54 | 7 Villas Compound Al Nahyan Area | Bloom Properties | Architectural & Engineering Consultant | Al Sahel Technical Facilities Co. L.L.C | Precast Concrete Elements |
55 | Industrial Complex in Mussafah | Emirates Link Contracting Establishment | Architectural Consulting Group (ACG) | Emirates Link Contracting Establishment | Precast Concrete Elements |
56 | Mosque | Mr. Abd El Rahem Hussein Khory | Amial Engineering Consultants | Stars General Contracting Co. L.L.C | Hollow Core Slabs |
57 | Majles | Abdulla Mohair Abdulla Mahan Al Ketbi | Al Ain Consulting Engineers | Capriole Construction Co. L.L.C | Hollow Core Slabs |
58 | Majlis Building at Mussafah | Private Majlis | City Plan | Civil Engineering & Contracting Co. (L.L.C) | Precast Concrete Elements |
59 | H.J Private Villa | Mr. Haji Khoori | Consulting Engineering Group | Orient House For Develpoment & Construction L.L.C. | Hollow Core Slabs |
60 | Z.A Private Villa | Mr. Zafir Alkathiri | Mr. Zafir Al Kathiri | Exeed Precast | Hollow Core Slabs |
61 | Cemix Ready Mix Factory Raw Material Storage | Cement Enterprises & Ready Mix | Cement Enterprises & Ready Mix | Exeed Precast | Hollow Core Slabs |
62 | A.M – Private Villa-HC | Mr. Ahmad Al Muhairi | Mr. Ahmad Al Muhairi | Exeed Aswar | Hollow Core Slabs |
63 | Labour Accommodation at Maya Cap 145 | Al Maya Resort | . | Capriole Construction Co. L.L.C | Precast Concrete Elements |
64 | Bawabat Al Sharq Phase 3-153 Villas | Baniyas Investment & Development Company | AECOM Middle East limited | Royal International Construction | Precast Concrete Elements |
65 | Construction of New Office Building | GASCO | GASCO | ACTCO General Contracting | Hollow Core Slabs |
66 | 200 Units Staff Accommodation at Baraka Site, Abu Dhabi | Emirates Nuclear Energy Corporation (ENEC) | Center Point Architectural Engineering | International, Mechanical & Electrical Co.W.L.L. (IMECO) | Precast Concrete Elements |
67 | Al Bateen Camp | Presidential Guard | Presidential Guard | Capriole Construction Co. L.L.C | Hollow Core Slabs |
68 | HCS For Mosque Building at Sweihan | Directorate of Military Works | Directorate of Military Works | Capriole Construction Co. L.L.C | Hollow Core Slabs |
69 | Construction of Simulator Building at Mahawi Camp -Cap 167 | Directorate of Military Works | Directorate of Military Works | Capriole Construction Co. L.L.C | Hollow Core Slabs |
70 | Jindal Mcwane-ICAD I | Mcwane | Archtitectural Design and Decoration | Gulf Erectrion | Precast Boundary Wall |
71 | Emirati Housing Develpoment at Jebel Hafeet | Tamouh Ambitions Unlimited | ACE Consultant | Trojan General Contracting | Precast Elements |
72 | New Sewerage Treatment Plany | ADNOC | ACE Consultant | Granite Construction Company | Beams, Cloumns Stairs- Parapet |
73 | Emirati Housing Develpoment at Jebel Hafeet-150 Villas | Tamouh Ambitions Unlimited | ACE Consultant | Hitec Concrete Co. | Hollow Core Slabs |
74 | Super Market – Alain | Mr. Regheb Thabt Hazza | Jumaira International Consultants | Al Wethaq General Contracting | Hollow Core Slabs |
75 | NON PROCESS BUILDING FOR GASCO | GASCO | Derby Design | ACTCO General Contractong | Hollow Core Slabs |
76 | Al Buteen Palace Project-Phase 2- Cap | Crown Price Court | HKA | Capriole Construction | Left and Right Wing Precast |
77 | CMW-11121-C001 | Directorate of Miltary Works | Directorate of Miltary Works | Arabtec Precast | Hollow Core Slabs |
78 | Joptewil Industrial Company | Joptewil Industrial Company | .. | Arabtec Precast | Hollow Core Slabs |
79 | Baniyas Sports Club | Baniyas Investment | AECOM | Baniyas Investment | Precast LV Room |
80 | Emirati Housing Develpoment at Jebel Hafeet-150 Villas | Tamouh Ambitions Unlimited | ACE Consultant | Hitec Concrete Co. | Isulated Panels with Parapet & Solid Panels |
81 | Privite Villa – Liwa | Zayed Al Qubaisi | Green Tech | Zayed Al Qubaisi | Hollow Core Slabs |
82 | Ruwais New International Schoool Complex -Phase 1-KG School | ADNOC | Architect Planning Group | National Holding & Mojil | Full System |
83 | Bawabt Al Sharaq Phase III 153 Villas | Baniyas Investment | AECOM | Royal international Construction | Full System |
84 | Abu Dhabi Grammer School at ME-9 | Mr. Said Eid Al Ghafly | AEC | Tower Tech | HC & Soild Boundary Wall |
85 | Satah Al Razboot Sarab- Package 7 | ADMA | CH2MHILL | Over Seas AST Co | Precast Elements |
86 | Camp & TCF For Power Upgrade Project- Zirku – Facilities | Zakum Develpoment Engineering | ABB | Granite Construction Company | Precast Manholes and Foundation |
87 | Emirati Housing Develpoment at Jebel Hafeet | Tamouh Ambitions Unlimited | ACE Consultant | Hitec Concrete Co. | Parapet & HCS |
88 | Upper Zakum UZ750 Island Surface | ZADCO | TECHNIP | NBHH | Foundations, Manholes, Pits, Duct Banks, Trenches |
89 | BAWABT Al Sharaq Phase II | Baniyas Investment | AECOM | Emirates Link Maltauro | Precast Substations |
90 | Construction of 6 Service Station Abu Dhabi | ADNOC | Design and Consulting Engineering | National Holding & Mojil | Precast Boundary Wall |
91 | Civil Defense Acadamey | Directorate of Miltary Works | Directorate of Miltary Works | Dhafra Int’l Projects Group | Hollow core slabs |
92 | 50 Villa in Alian | Private Villas | . | Ultraforce Posttension Concrete | Hollow core |
93 | CMW-11021-C005 | Directorate of Miltary Works | Directorate of Miltary Works | Bin Hafeez General Contracting | Precast Substations |
94 | CMW-14001-C001 | Directorate of Miltary Works | Directorate of Miltary Works | Capriole Construction | Hollowcore slabs |
95 | Precast Twin Villas at Meydan Heights Residential Community | Medyan | Turner Consultant | Tower Tech | Precast Elements |
96 | Precast Twin Villas at Meydan Heights Residential Community | Medyan | Turner Consultant | Arabtec Precast | Precast Elements |
97 | ESI Carbon Capture and Storage | Masdar & Adnoc | Tebodin Consultant & Engineering | Dodsal Engineering | Hollowcore slabs |
98 | Polymer Additive Plant at Al Samha | Polysys Additive Technologies Middle East LLC | WH International Architects & Engineers LLC | Hadeed Emirates | Hollow Core Slabs |
99 | Ruwais Housing Complex expansion-phase IV Construction | ADNOC | Hills Consultant | Dhabi Contracting | Precast Concrete Elements |
100 | City Mall Extension Works, Madinat Zayed, Western Region, Abu Dhabi | Mr. Mohammed Al Falahi | firas engineering consultant | Al Falah Group | Precast Concrete Elements |
101 | Construction Alain Al Fayda Emirati Housing 250 Villas | Musanada & al Qudra Holding | Professional Arabian Consulting Engineers LLC & Al Salaam | Hitec Concrete Co. | Hollow Core Slabs |
102 | Boundary Wall for Farms at Al Bahya FRM 143,Abu Dhabi | Mr. Mohammed Khori | Al Khail Consultant | Orient House | Precast Boundary Wall |
103 | Boundary Wall for Farms at Al Bahya FRM 113,Abu Dhabi | Mr. Mohammed Khoori | Al Khail Consultant | Orient House | Precast Boundary Wall |
104 | Boundary Wall for Farms at Al Khaznah FRM 318,Alain | Mr. Younes khoori | Al Khail Consultant | Orient House | Precast Boundary Wall |
105 | Boundary Wall for Farms at Al Khaznah FRM 449,Alain | Ms. Amna Folathi | Al Khail Consultant | Orient House | Precast Boundary Wall |
106 | Logistic Warehouse ( Phase 1 ) Khalifa port & Industrial zon | Abu Dhabi Ports Companu | Ideal Design | Albwardy Engineering Enterprises | Precast Boundary Wall |
107 | Extension of Mr. Yasser Villa | Mr. Yasser | ATLAS | National Transport & Contracting | Hollow Core Slabs |
108 | Modification Works of Evangelical Church at plot 60 | Evangelical Church | – | Kfouring Engineering | Hollowcore Slabs |
109 | Construction of Private Villa at Shakbout City | – | BASALT Engineering Consultancy | Sky Scape General Contracting | Hollowcore Slabs |
110 | Civil Defence Academy | UAE ministry of Interior Abu Dhabi HQ | SA Engineer Consultant | Dhafra Int’l Projects Group | Hollowcore Slabs |
111 | ADNOC ONSHORE BAB ACCOMODATION COMPLEX (BAC) HABSHAN, Abu Dhabi | ADNOC | – | AL HELOUL CONCRETE CONCEPTS LLC, Sharjah | Boundary Wall |
112 | Construction of difference Faclities at Al Ruwais | Commander Military work Abu Dhabi | – | Capriole Construction | Hollowcore Slabs |
113 | Al AKH Project in Sweihan | Presidential Guard Command | Aurecon | Capriole Construction | Hollowcore Slabs |
114 | Construction kids Park in Al Rahba Farms | Saqr Naser Salem Seif Al Nauaimi | AL BUNYAN Consultant Engineers | East Arabella | Hollowcore Slabs |
115 | Development Works of Shooting Range Field | Presidential Guard Command | Aurecon | Capriole Construction | Hollowcore Slabs |
116 | Fabrication & Delivery of Offshore Concrete Sleepers for Project 7309 | ADNOC | – | NPCC | Precast Sleepers |
117 | Construction of Unshaded Parking Area at Rumaitha | ADNOC | – | Al Femah Contracting Co | Single Face Jersey Barrier |
118 | ADNOC Campus Development | ADNOC | – | Tornado Total Landscape LLC | Hollow Core Slabs |
119 | 40 MW MGIC 1 & MGIC2 BESS Building in phase 1 | Abu Dhabi Water & Electrical Authority | SEREX International Consultants | Lindenberg-Emirates | Hollowcore Slabs |
120 | Construction of Faikh IVF Pharmacy Abu Dhabi Island | Hamad Mohamad AL-Rumaithi | STH Society technology House | Finesse General Contracting | Hollowcore Slabs |
121 | Construction of CICPA Facilities Mahawi Phase III Abu Dhabi | UAE ministry of Interior Abu Dhabi HQ | SA Engineer Consultant | Dhafra Int’l Projects Group | Hollowcore Slabs |
122 | Construction of Heritage Cultural Village at Al Wathba, Abu Dhabi | Ministry of Presidential Affairs | EWAN | Ghantoot Transport & Gen. Cont. LLC | PC/HCS |
123 | Lulu Staff Accommodation | Lulu Group International | Capital Engineering | GBH International | Precast Building |
124 | 46 Residential Villas | H.H Sheikha Bint Zayed Bin Sultan Al Nahyan | Al Shahama Engineering Consultancy Bureau | Daary General Contracting | PC/HCS |
125 | My City Centre Masdar | Majid Al Futtaim | KEO International Consultants | Amana | Precast Concrete Elements |
126 | Jebel Buhais Geological Park | HH Rulers Office, Government of Sharjah | Hopkins | HARDCO | Precast Concrete Elements |
127 | Reem Mall | Al Farwaniya Property Development | MACE | Ghantoot – Itinera SpA | Hollowcore Slabs |
128 | Development of Hudayriat Island | Musanada | Salfo And Associates SA Engineering | City Construction Gen Cont | PC/HCS |
129 | Casting & Supply of Sleepers to ADNOC L&S Mussafah Base | ADNOC | – | ADNOC L&S | Precast Sleepers |
130 | YAS South Integrated Destination Resort Arena | MIRAL | H+K | BAM International | Precast Concrete Elements |
131 | 306 Villas at Al Saad Al Ain | Musanada | Dorsch Gruppe | Al Jaber Group | PC/HCS |
132 | Reem Mall | Al Farwaniya Property Development | MACE | Ghantoot – Itinera SpA | Hollowcore Slabs |
133 | Development of Hudayriat Island | Musanada | Salfo And Associates SA Engineering | City Construction Gen Cont | PC/HCS |
134 | YAS South Integrated Destination Resort Arena | MIRAL | H+K | BAM International | Precast Concrete Elements |
135 | Higher College of Technology New Campus | Higher Colleges of Technology | KN International | Tornado Group | PC/HCS |
136 | Al Aryam Interchange | Musanada | KEO International Consultants | Ghantoot | Girders |
137 | NPCC -SUPPLY AND FABRICATION OF OFFSHORE CONCRETE SLEEPERS FOR PROJECT 8353 | ADNOC | – | NPCC | Precast Sleepers |
138 | 410 Villas at Mirfa | Musanada | Pioneer | Combined Group Contracting Co | PC/HCS |
139 | Construction of Extending Sh. Zayed Bin Sultan Street at Umm Lafina Island to connect Al Reem Island – Contract – 1 | Musanada | Aurecon | Ghantoot Transport | Double Sided Barriers |
140 | Substation Buildings in Khalifa City | ADDC | Derby Design Consulting Engineers | HELIOPOLIS ELECTRIC LLC | Substations |
141 | 32 NOS. OF TUNNELS (26M X 8M X 21M) | BEBO | – | Al Wathba Cement Industries | Precast Concrete Elements |
142 | ADCOOPS WAREHOUSE, KIZAD, ABU DHABI, U.A.E | Abu Dhabi Cooperative Society | Ideal Design Engineering Consultants LLC | JAZAL Engineering & Contracting LLC | Precast Boundary Wall |
143 | CABLE TRENCH AND SLAB CONSTRUCTION FOR AL DHAFRA SOLAR POWER PLANT PROJECT | Dhafra PV2 Energy Company LLC | Derby Design Engineering Consultancy | CCS COMSERVICE FZ-LLC | Precast Foundations |
144 | NEW MEDICAL CENTRE AT SEA PALACE, ABU DHABI | Crown Prince Court | Hans Kutzen Associates Inc. | BRIGHT ACCORD GENERAL CONTRACTING LLC | Hollow Core Slabs |
145 | BANIYAS NORTH DEVELOPMENT, INFRASTRUTURE, VILLA & STREETSCAPE PHASE 1, ABU DHABI, UAE | MODON | De Leeuw International | HiTECH Concrete Products LLC, Abu Dhabi | Hollow Core Slabs |
146 | HCS BOUNDARY WALL FOR BTS FULFILLMENT CENTRE IN ICAD 3 ABU DHABI | Abu Dhabi Ports | Global Engineering Consultants LLC | RAQ Contracting LLC | Precast Works |
147 | CABLE TRENCH AND SLAB CONSTRUCTION FOR AL DHAFRA SOLAR POWER PLANT PROJECT | Dhafra PV2 Energy Company LLC | Derby Design | CCS COMSERVICE FZ-LLC | Precast Foundations |
148 | THE GROVE – PHASE 1, SAADIYAT ISLAND, ABU DHABI | ALDAR | WS Atkins & Partners Overseas | ASGC CONSTRUCTION LLC | Hollow Core Slabs |
149 | DEVELOPMENT OF ROUNDABOUT AT ICAD 1, ABU DHABI, UAE | Malegori Landscape General Contracting L.L.C | – | Emirates Link Nitco | Precast Foundations |
150 | HCS BW for 10 Plots at Al Rahba | Crown Prince Court | – | Elite Agro | Hollow Core Boundary Wall |
151 | Supply & install Boundary Wall | Mr. Khaled Khalfan Al Amimi | – | Mr. Khaled Khalfan Al Amimi | Boundary Wall |
152 | Supply transformer foundations for PV2 independent project | Dhafra PV2 Energy Company LLC | Derby Design | Man Energy LLC | Foundation |
153 | Development of Roads & Infrastructure Works for New Plots in Sector SW-13 at Khalifa City | ADDC | National Consulting Office for Engineering | Safari General Contracting | Substation |
154 | Boundary Wall at Mafraq Area | Abu Dhabi Waste Management Centre | Capital Engineering Consultancy | Desert Development Contracting | Boundary Wall |
155 | Bida Saif Farm 16 | Crown Prince Court | RGC | MEDMAC General Contracting Company | Boundary Wall |
156 | Supply & Delivery Precast chambers at G-13 Media Zone at Yas Island | – | – | Bloomscape | Valve Chambers |
157 | CMW – 21002-C001- Zayed Military Center | CMW | CMW | Six Sigma | Precast & HCS |
158 | Supply & Install HCS for Villa at Al Wathba | Sheikh Mohammed Bin Sheikh Mansour | E11 Engineering Consultancy & Project Management | Stars General Contracting Co. | Hollow Core SLabs |
159 | Supply Ex-Factory 320mm HCS for Service Block Chalet SPA | – | – | Hitech Concrete Products | Hollow Core Boundary wall panels |
160 | Al kendi International Private School at MBZ City | Al Taher Musabah Alkendi Almarar | Consultng Engineering Group | Prompt Steel Buildings & Contracting | Precast Works |
161 | Boundary Wall for P480 – Private Villa Compound | PRIVATE | HANNOVER CONSULTING ENGINEERS | ADICC | Boundary Wall |
162 | Baniyas Shopping Centre | Greene Retail Management | Architectural Consulation Group | ADICC | Hollow Core Slabs |
163 | Supply And Fabrication Of Offshore Concrete Sleepers For Project 8353 | ADNOC | – | NPCC | Sleepers |
164 | Supply & Install Precast Foundations for AADC in Al Ain | Al Ain Distribution Company | ATKINS | Ray International Electrical Contracting and Maintenance LLC | Foundation |
165 | Precast Foundations for Sea World Project | – | – | Tornado Total Landscape LLC | Foundation |
166 | Etihad Rail Network, Al Faya Depot, Abu Dhabi | EtihadRail | JACOBS | VINCI – ARCHIRODON JV | Manholes |
167 | Gravity Line | EtihadRail | JACOBS | Image General Contracting, Abu Dhabi | Protection Slabs |
168 | 32 Nos. of Tunnels (26m x 8m x 21m) | BEBO | – | Al Wathba Cement Industries | Precast Concrete Arch Elements |
169 | Supply Ex-Factory HCS for Falcon Office Building | – | FIRAS Engineering | GRAND FALCON CONTRACTING LLC | Precast Works |
170 | Saad Labour Camp | – | – | Al Foah LLC | Design & Approval |
171 | Boundary Wall at ADCOOPS Warehouse Kizad | Abu Dhabi Cooperative Society | Ideal Design Engineering Consultants LLC | JAZAL Engineering & Contracting LLC | Boundary Wall |
172 | Supply & Delivery of precast foundations | Dhafra PV2 Energy Company LLC | Derby Design Engineering Consultancy | CCS COMSERVICE FZ-LLC | Foundation |
173 | Hollow core at New Medical Centre at Sea Palace | Crown Prince Court | Hans Kutzen Associates Inc. | BRIGHT ACCORD GENERAL CONTRACTING LLC | Hollow Core SLabs |
174 | Supply Ex-Factory HCS for North Baniyas Villas | ALDAR | Mott Macdonald | HiTECH Concrete Products LLC, Abu Dhabi | Hollow Core SLabs |
175 | Supply & Delivery of 16 nos precast foundations | Dhafra PV2 Energy Company LLC | Derby Design Engineering Consultancy | CCS COMSERVICE FZ-LLC | Foundation |
176 | Supply & Delivery of precast foundations – 180 NOS | Dhafra PV2 Energy Company LLC | Derby Design | CCS COMSERVICE FZ-LLC | Foundation |
177 | Infrastructure work for private villa at al reef palace | MODON | ICON | BRIGHT ACCORD GENERAL CONTRACTING LLC | Hollow Core Slabs |
178 | Data Centre at Al Shira Palace | IMKAN | – | El Race Cons. & Gen. Cont. Co. LLC, Abu Dhabi | Precast Works |
179 | Boundary Wall for MBZ Market Community | Abu Dhabi Municipality | Amar Golden Design LLC | Prompt Steel Buildings & Contracting, | Boundary Wall |
180 | Supply & Install Boundary Wall at Asphalt Plant at Mafraq | – | Al Jazeera Engineering Consultants | AL GEEMI & PARTNERS CONTRACTING Co. L.L.C., | Boundary Wall |
181 | HCS Boundary wall for BTS Fulfillment Centre in ICAD 3 Abu Dhabi | Abu Dhabi Ports | Global Engineering Consultants LLC | RAQ Contracting LLC | Boundary Wall |
182 | Supply & Delivery of precast foundations – 16 NOS | Dhafra PV2 Energy Company LLC | Derby Design | CCS COMSERVICE FZ-LLC | Foundation |
183 | Supply HCS for The Grove-Phase 1,Saadiyat Island | ALDAR | WS Atkins & Partners Overseas | ASGC CONSTRUCTION LLC | Hollow Core Slabs |
184 | Ex-factory supply of PS Slabs & Beams for Yas Acres | ALDAR | AECOM | Hitech Concrete | Slabs & Beams |
185 | Riyad City Development, Abu Dhabi | MODON | Parsons International Ltd | Arabic Engineer Control and Electro Mechanical Systems Co. LLC (Al Muhandes) | Boundary Wall |
186 | Deliver precast elements for Development of Roundabout | Malegori Landscape General Contracting L.L.C | – | Emirates Link Nitco | Foundation |
187 | Construction of Boundary Wall for the Trucks Parking | – | – | EXPRESS FACILITIES MANAGEMENT | Boundary Wall |
188 | Al Shalilah Boundary Wall | – | – | Royal Internatioal Construction | Boundary Wall |
189 | Supply Ex-Factory Precast Slabs for Bourouge 4 | Abu Dhabi Polymer Company Ltd (Borouge) | – | China Railway International Group-Abu Dhabi | Hollow Core Slabs |
190 | Foundations for Al Ain Farm Extensions | – | – | Six Sigma Middle East Constructions | Boundary Wall |
191 | Supply Ex-Factory of HCS for Yas Acres | ALDAR | AECOM | Hitech Concrete | Hollow Core Slabs |
192 | Cable Trench and Slab Construction for Al Dhafra Solar Power Plant Project | Dhafra PV2 Energy Company LLC | Derby Design | CCS COMSERVICE FZ | Manholes |
193 | AD-458 PROPOSED ENOC FILLING STATION (SITE 1702) @ PLOT NO. C18, SECTOR: AL REEF, ABU DHABI, UAE. | ENOC | Al Suweidi | Eastern International | Boundary Wall |
194 | EMIRATI SCHOOL, AJMAN | MOEI | Eng. Adnan Saffarini Office | Tornado Group | Precast Works |
195 | MINA COMPLEX STREETSCAPES – LANDSCAPE WORKS | Crown Prince Court | ATKINS | Bloom Scape | Boundary Wall |
196 | PRECAST CONCRETE FOUNDATIONS AD PORTS KIZAD | AD Ports Group | Amar Golden Design LLC | Mister shade | Foundations |
197 | Install HCS for CMW-22109-B001 at Al Maqtara | CMW | CMW | Trust Construction Est., | HCS |
198 | Install HCS for CMW-22024-C001 at Zayed Military City | CMW | CMW | Trust Construction Est | HCS |
199 | Six Buildings Project (23003) | – | – | Ultraforce Posttension Concrete | Precast Works |
200 | Saadiyat Cranleigh School (193): – Precast Boundary Wall | ALDAR | GHD | Al Firas General Contracting Establishment | Boundary Wall |
201 | 2 Villas for North Baniyas Project | ALDAR | Mott Macdonald | Hard Precast Buildings Systems LLC | Hollow Core Slabs |
202 | North Yas – Yas Living (NOYA), Abu Dhabi (NOYA-Boundary Wall) | ALDAR | ARCADIS | Fibrex LLC | Villa & BW |
203 | Qasr Al Jurf – Villas & Boundary Wall | IMKAN | Pioneer | Pivot Engineering and Contracting Company L.L.C | Villa & BW |
204 | Construction Works for First Phase for Al Fursan Brigade Command | Presidential Guard Command | Al Salaam | CIVIL POWER GENERAL CONTRACTING LLC | Precast Buildings |
205 | Supply Ex-Factory of HCS 150mm & 320mm thick – P.O. No. 220001005 | – | – | Ultraforce Posttension Concrete | Hollow Core Slabs |
206 | Riyad City North, Phase 7A, Abu Dhabi | Aldar | Parsons International Ltd | Western Bainoona | Substation |
207 | Reeman 2 villas – 339 nos | ALDAR | Mott Macdonald | UNEC | Full Precast |
208 | Boundary wall for Sewarage Treatment Plant for Al Ghadeer Phase 2 | ADSSC | – | Pure Water Technology, | Boundary Wall |
209 | Substations and Boundary wall at Jubail Island | Jubail Island Investment Company | Parsons | Gulf Contractors | Substations & BW |
210 | Supply Ex-Factory of Buildings for Mina Palace | – | – | GRAND FALCON CONTRACTING LLC | Precast & HCS |
211 | Substations for North Baniyas Phase-3 | Abu Dhabi Port | Geo Global Engineering | Heliopolis Electric LLC | Substations |
212 | Boundary Wall for Judicial Layout | Judicial Department | Beirut Engineering Consulting Bureau | CIVIL POWER GENERAL CONTRACTING LLC | Boundary Wall |
213 | Capping beams for Jubail Island | – | – | APCC | Capping Beams |
214 | Boundary Wall for Abu Dhabi Villa | Hasabi Real Estate | Al Jazeera Architect Engineering | Etlad Construction Co. LLC | Boundary Wall |
215 | Supply & delivery slipway slabs to Jubail Island | JIIC | AL GURG CONSULTANTS | APCC Piling & Marine Contracting LLC | Precast Works |
216 | Supply & Delivery Precast Troughs for 400KV HVAC Cable works in Shuweihat & Mirfa | TRANSCO | – | Heliopolis Electric LLC | Precast Works |
217 | Construction of 2 buildings at Zayed Military City | CMW | CMW | Capriole Construction Co. L.L.C., | Precast Works |
218 | Construction of Facilities at Qusiwerah Air Base | CMW | CMW | Capriole Construction Co. L.L.C., | Precast Works |
219 | Supply Ex-Factory boundary wall panels at Al Hamra air base | CMW | CMW | Capriole Construction Co. L.L.C., | Boundary Wall |
220 | BANIYAS NORTH DEVELOPMENT – PHASE 3A & 3B | ALDAR | Mott Macdonald | Hard Precast | Villas |
221 | AL REEMAN 2 – Phase 2, Abu Dhabi, UAE | ALDAR | Mott Macdonald | Tristar Engineering & Construction, LLC | Substations |
222 | BLOOM LIVING CORDOBA | Bloom District Properties | Dar Al Handasah Consultants (Shair & Partners) | Emirates Link Maltauro | Villa & Boundary Wall |
223 | CAP-255-CMW-22021-C001-CONSTRUCTION OF SHOOTING RANGE FIELD AT ZAYED MILITARY CITY | CMW | CMW | Capriole | Obs Tower & HCS |
224 | ICS 001 – Construction of Two Substations at Tawazun Industrial park – TIP, Ajban Road, Abu Dhabi, UAE | Tawazun Industrial Park | INTEK | ICS | Substations |
225 | Substations at Saadiyat Lagoons District | ALDAR | PARSONS/ SALFO | HILALCO – Wade Adams JV | Substations |
226 | Supply & Delivery Cladding to 321 Pitches & Facilities at Hudariyat Island | MODON | BDP/Aurecon | ELM | Cladding Walls |
227 | Supply & install HCS for G+1+R office in baniyas | – | – | High Art General Contracting | Hollow Core Slabs |
228 | Construction Works of 8th Phase for Presidential Guard Institute Command / National School Service at Seih Hafeer– Project No. PGC-210016-C-P8 – Contract No. PGC/CFD/572/12/2021/322 | PGC | PGC | NBHH | Observation Towers |
229 | Zayed School – Boundary Wall | Department of Education & Knowledge | MZ Architects | UNEC | Boundary Wall |
230 | Noya 2 school development in Yas Island | ALDAR | NEB Engineering Consultancy Office | Tornado General Contracting LLC | Precast Works |
231 | 96+2 Villas at Qasr Al Jurf – Phase 2 and boundary wall | IMKAN | OTAK International/ KEO | Al Firas General Contracting Establishment | Villa & BW |
232 | Delivery of North Baniyas Villas – A1M | ALDAR | Mott Macdonald | Hitech | Precast Works |
233 | Supply & install boundary wall for Yasmina School | ALDAR | GHD | Tornado General Contracting LLC | Boundary Wall |
234 | UAE University, Maqam 2, Al Ain, UAE | UAE University | – | El Race Cons. & Gen. Cont. Co. LLC | Boundary Wall |
235 | BLOOM LIVING CORDOBA – GRC | Bloom Properties | – | Emirates Link Maltauro | GRC |
236 | ENEC Staff Accomodation, Abu Dhabi | ENEC | KEO | Hitech | Hollow Core Slabs |
237 | Baniyas North Ph-2 A2M & B2M + B1M and C2M villas HCS 150 & 200 (Ex-Factory) | ALDAR | Mott Macdonald | Hitech | Hollow Core Slabs |
238 | Precast Building ( PGC – AJBAN) | PGC | PGC | TAR Emirates | Precast Works |
239 | Al Mina Palace, Abu Dhabi | ADNOC | MCDERMOTT | Tornado General Contracting LLC | Security Wall |
240 | Construction of Residential Villa at Al Shawamekh | Private Owner | Graffiti | Afaq Al Jazeera General Contracting | Precast Villa |
241 | Local Service Centre at Al Rahba | Tristar Real Estate | ACE | Tristar Engineering & Construction L.L.C | Hollow Core Slabs |
242 | Delivery of Troughs and cover slabs | TRANSCO | ENERVO Consult LLC | Heliopolis Electric LLC | Precast Concrete Trough and its Cover Slabs |
243 | Install Precast Boundary wall | ADDC | AECOM | HILALCO | Boundary Wall |
244 | Delivery of Fascia panels for Jubail Island | JIIC | Al Gurg Consultants | APCC Piling & Marine Contracting LLC | Panels |
245 | HCS Boundary wall for private villa at Markazaniya – Al Ain | Private | – | Buzztop Investment | Boundary Wall |
246 | Supply & Install precast & HCS for multi purpose hall | Abu Dhabi Police | International Art Engineering Consultancy | EL RACE CONS & GEN CONT.CO-LLC | Precast & HCS |
247 | CONSTRUCTION OF BUILDINGS AND FACILITIES AT MINA PORT (P693) | National Guard Command (NGC) | National Guard Command (NGC) | Tornado General Contracting L.L.C | Precast Works |
248 | PROPOSED BOUNDARY WALL FOR AL JAZEERA STEEL PRODUCT COMPANY LLC | ADPC | WINNER Holistic Consultant | Al Jazeera Steel Products Co. L.L.C. | Boundary Wall |
249 | SADIYATH BEACH CLUB: KAI BEACH PROJECT, ABU DHABI | ALDAR | HKA | Six Sigma Middle East Constructions, Abu Dhabi | Boundary Wall |